• Open House
  • The new tanks

Deephams Sewage Treatment Works

Thames Water

place
AMK Site Office, Picketts Lock Lane, N9 0BA
info_outline
Partial disabled access, Refreshments, Toilets
London's fourth largest sewage works. Thames Water is upgrading the process while continuing to treat the 209,000 tonnes of flow arriving each day. This can increase to over 1.3 million tonnes during heavy rainfall.

Design

Original design
Thames Water, 2015
Type
Infrastructure/engineering
Period
Contemporary